| Easley Combined Utilities, Easley, SC, USA: More than 50% increase in water
|
| Santander - SPAIN
|
| Kranji NEWater - SINGAPORE
|
| Wastewater treatment plant, Dijon - FRANCE
|
| Beijing Yansan Veolia Water, CHINA: 52% energy savings, 5GWh saved per year, ROI in 1.5 years
|
| Bacviz Kecskemet, HUNGARY: 15% energy savings, ROI in less than 3 years
|
| Water companies, NEW ZEALAND: 20% of energy savings, ROI in less than 2 years
|
| Veolia Water - FRANCE
|
| Grasse “Les Roumiguières”, FRANCE: Cost effective and size optimized solution
|
|
|
 |
Key customer benefits:
15% energy savings, ROI in less than 3 years
I. CUSTOMER ENVIRONMENT / PROJECT CONTEXT
Customer profile (*):
- Bacviz is the operation company in charge of providing drinking water to the town and region of Kecskemet. It represents a population of 120 000 inhabitants.
Customer objective and constraints (*):
- In Hungary the electrical utility providing electrical energy to the water operation company has a price policy based on a fixed subscription. When the water utility has peak demands over the subscription value some penalties are applied. The water utility, want to avoid this cost.
- More generally a clear understanding of the consumption of the different process steps is required to optimize the process. On average electricity bill represents up to 30% of operation cost for a water utility.
II. SOLUTION IMPLEMENTATION
Implementation methodology (main phases) (*):
1. Meeting with operators to understand the key step of its process : deep underground pumping, sand filters, chlorination. 2. Instrumentation of the electrical network of the customer with measurement devices connected to a web server. 3. Analysis of the data collected by the Schneider Electric services team. 4. Creation of an official report on a regular basis and presentation of the conclusions to the operation company staff.
Duration:
Solution overview (services, products, systems, architectures…) (*):
1. Revamping of Low Voltage switchgear 2. Compact NS Micrologic electronic trip units 3. Powerlogic meters and control 4. Modbus/Ethernet communication units 5. Ethernet server information collection 6. Information analysis
How did we estimate the energy savings (methodology, tools, ...)
- Energy savings have been directly obtained by the reduction of the contract from a 600kW base to a 400kW base (winter subscription)
III. RESULTS / ACHIEVEMENT
Customer benefits (*):
- The customer has a lower contract with the water utility.
- He is able to manage the process to avoid peak demand: no filters backwashing during deep water pumping for instance.
- Balancing of the pumps to limit ageing.
- Pulsed air compressor optimisation.
Customer testimonies (Verbatim):
- Plant operation manager: “After 6 months of operation and the two first monitoring reports we have optimized the energy cost. We wish to extend the complete supervision of our electrical equipment on 2 pumping stations at Kecskemet.”
Schneider Electric differentiating values VS competitors:
- Local service team collaboration with a local panel builder.
- Full solution proposed by the same team including electrical equipment revamping, Ethernet TCP/IP transmission of data via a safe router, interpretation of data by experts, quarterly reports for recommendations.
|
| | |
| |
 |
To know more
|
Requests for Solutions, Products and Services information
Solution breakdown
Main products & systems:
- Compact NS
- Powerlogic
- Variable speed drive ATV
|
|
|
|