- In April 2000: first refurbishment contract for the Pinsk substation, followed by the Kobrin substation in May 2000. The Turov, Mozyr, Bobovitchi and Zaschebie substations were then awarded to Schneider Electric for the quality of its offer and equipment. The competitive prices, the continuous work of Schneider Ukraine and Bielorussia, the different quality procedures and the compliance with technical requirements (SF6 breaking imposed for 6 kV overvoltage motor protection) and local standards (GOST R and BLR) meant we were able to rise above our competitors.
- With the signature of this latest contract, Schneider Electric will have supplied all the Electrical Distribution and Control & Command equipment for the entire pipeline.
Gomel Transneft Drujba: Kobrin, Pinsk, Tourov, Mozyr, Zaschebie and Bobovitchi pump stations
Ukraine: Kremenchoug, Lyssychansk, Luganskaya and Sneguirevka pump stations