Main drivers
- Effects of power outages: energy availability
- Need of high quality energy
- Energy cost effectiveness
Value proposition
- Quality of service and network reliability multiplied by 2:
- 50% less outage duration
- Areas affected by the faults divided by 2.
- Monitored & improved power quality - Operation and capital costs reduced by 30% thanks to
- non distributed energy cost reduction
- operating cost reduction during major fault on the network
- maintenance cost reduction - Easier implementation than usual Scada project
- development time 50% shorter thanks to preconfigured architectures
- resource needs 40% lower and easier project management
- scalability 10 times faster than traditional Scada
Differentiation factors
- Cost efficient solution
- Fast project development
- Low maintenance