Main drivers
- Renewable energy: less impact on environment than large hydro plant
- Very flexible source of energy: used when needed
- Available in some remote areas
- Better use of the river potential
- No heavy investment
Value proposition
- Enhance installation reliability and optimize power production
- Reliability multiplied by 2 thanks to type tested architecture
- Power production increased by 30%
- Energy efficiency doubled
- Reduce Operation and capital costs
- Investment cost reduced by 20%
- Non-productive time divided by 2 optimizing power output
- Maintenance cost 30% lower
Differentiation factors
- Cost efficient solution
- Fast project development
- Low maintenance